Heritage – bathroom finishing, part 4

June 11, 2012

Continuing work on the bathroom. I finished the beadboard trim I started over the weekend.

I cut a notch to accommodate the pipe running from the high tank to the loo.

I also added a water line with a shutoff valve to the tank just as I had done for the wall sink, though I didn’t think to take a better picture of it before I had the loo in place. Because the beadboard wall treatment adds some thickness, I had to glue the loo to the floor and the tank to the wall.

I shortened the chain that came with the kit, because it was nearly hitting the floor.

I figured the handle has been hitting the wall for years, so I dragged it across the beadboard to transfer some of the paint. :D

The new ceiling board for the bathroom has the required electrical channels already cut so it was ready to install.

Love this room!

I need only a few more accessories, and this room will be complete! :]

Update: After working on the back roof, I was able to finish up the bathroom wallpaper. I added one small strip of trim on the outer wall to disguise the tab and slot that had been showing in that area. I also added ceiling trim along the front wall to hide the slight gap there. I plan to add more trim around the outer wall here, but the height of the bathroom door makes it impossible to add the same trim to the inner wall. More on that to come.

Comments

Leave the first comment